the size of thermal units and in steam parameters resulting in better plant efficiency. BACKGROUND In the 12th plan, the RM/LE work of 37 units of capacity 7202 MW has been completed and presently 71 units of 14,929 MW capacity has been identified for RM/LE work for the subsequent five year period(2017 2022).The old and small
WhatsApp: +86 18838072829IGEN1/BAC/EBSILON THEROMO DYNAMIC SIMULATION MAPPING PERFORMANCE ANALYSISSUMMARY REPORT 4of 59 3I Graph for Operating Boiler Efficiency of 500 MW capacity units (%) 3J Graph for Operating Boiler Efficiency of 250 MW capacity units (%) 3K Graph for Operating Boiler Efficiency of 210 MW capacity units (%) 3L Graph for Operating Boiler Efficiency of 100125 MW capacity units (%)
WhatsApp: +86 18838072829Erection of Mill,ID and FD Fans for 210 MW Boiler in Thermal Power Station I at NLC Ltd., Neyveli Erection of Coal Mill, ID FD Fan, ABG and Submergible Slag Conveyor in Boiler I II and Erection of Air Pre Heater in Boiler I in Thermal Power StationI Expansion (2x210 MW) at NLC Ltd., Neyveli
WhatsApp: +86 18838072829for 120 MW Unit 2000 MT/ Day for 210 MW Unit 3000 MT/ Day for 500 MW Unit 7000 MT/ Day BOILER AUXILIARIES Medium Design Motor No. SR Dut off / Quanti ... A mixture of cold hot air is then sent to the coal mills. ii. Hot Primary air system : In this system the air handled by the primary air fans is hot. ...
WhatsApp: +86 18838072829Stateoftheart Operation and Maintenance training for coal based and gas based units ... mills, APH and associated ducts, turbines and condensers of 250 MW Unit1 of SSTPS, Suratgarh: ... To study the vibration problem in TG set and TG foundation of 210 MW, Unit2: 2006: 83: DVC: 210 MW Mejia TPS. Helium leak detection test of condenser. 2006 ...
WhatsApp: +86 18838072829This paper reports the results of energy analysis of two 210 MW coal‐fired thermal power stations located a good distance apart. A new and simple method for evaluation of thermal efficiency has been presented. Measures for improvement in plant performance in the coal, air, water and steam circuits as well as auxiliary power and secondary oil have been depicted, based on the analysis and ...
WhatsApp: +86 18838072829Procurement of coal mill coal feeder bearings for Unit (R M), KTPS, Koradi.(GROUPC: SHRI KRISHNA ENTERPRISES MUMBAI ... Plant Maintenance Works at WTPII. TRIMURTI ENGINEERING SERVICES NAGPUR 2 ... 210 MW, KTPS, KORADI. STAR INDIA ELECTRICALS NAGPUR
WhatsApp: +86 18838072829Maharashtra State of last ten years is referred. The plant is of 210 MW generation capacity with the prime fuel used as pulverised coal. Major four areas of boiler are identified Water wall, Economiser, Reheater, and Final superheater and the tube failure occurred in different zones with the loss in generation on account of tube
WhatsApp: +86 18838072829The mass ratio of air to coal is dependent on the coal mill manufacturer and usually ranges from to with a typical value of An air to fuel mass ratio of produces a primary stoichiometric ratio of approximately, or 16% of the air necessary for complete combustion of the coal.
WhatsApp: +86 18838072829Maintenance of coal mill DP lines including stubs, impulse lines, filter regulator etc. at 210 MW, KTPS, Koradi. / / 3 660MW/CHP T736/81264 Procurement of PLC spares installed at CHP 3 X 660MW KTPS, Koradi. ... Assembly of MVM 32R Coal Mills of 3 X 660 MW Units at KTPS, Koradi. / / 15 660MW/TM/
WhatsApp: +86 18838072829INTRODUCTION India has an installed capacity of electrical power of 75 GW out of which 45 GW is through coalfired thermal stations. Coal units generate 235 TWh of electrical energy annually at a plant load factor of about 60%. Of the 325 coalfired units (30 to 500 MW) the 210 MW sets are the workhorses (50% of the installed thermal capacity).
WhatsApp: +86 18838072829By adopting better maintenance practices for thermal power plants, enhance the capacity utilization of plants, thereby the present average PLF of % of 210 and 250 MW units can be enhanced to about 95 % that will release an additional energy of about lakh MU/year.
WhatsApp: +86 18838072829Coal can be fed and removed from both sides of the mill. Half mill operation for partial loads allowed. Input coal size 25 mm white output is 70 to 90 microns Very high coal fineness achievable. Present Manufacture Range of Tube Mills Mill Type Size(Metres) Ball Range(Tons) Charge Nominal * Capacity(T/HR)
WhatsApp: +86 18838072829The energy conservation measures will reduce the auxiliary power of 210 MW from % to % with a payback period of 1 to 5 years. ... to the mill can be controlled by sensing the coal air ...
WhatsApp: +86 18838072829Tender For coal mill maintenace works Chetan Enterp. A'bad. 4 TestII 2937 04/04/2015 Supply of miniature Motor protection Relays for LT Motors at TICII TPS. Tender To maintain minimum stock level. Ratan Machinary Stors, ParliV. 5 EMII 2946 06/04/2015 Suply of carbon Brushes for BHEL make 210 MW Turbo Generator set at EMII TPS.
WhatsApp: +86 18838072829INTRODUCTION India has an installed capacity of electrical power of 75 GW out of which 45 GW is through coalfired thermal stations. Coal units generate 235 TWh of electrical energy annually at a plant load factor of about 60%. Of the 325 coalfired units (30 to 500 MW) the 210 MW sets are the workhorses (50% of the installed thermal capacity).
WhatsApp: +86 18838072829Strategy Maintenance Significant Item Inspection / Execution Task Coal Measure HGI (hard grove index), moisture content, abrasiveness and size of coal fed to mill. Pulverised fuel (PF) Measure particle size distribution, PF velocity and temperature. Grinding media (Balls and Rings) Measure ball diameter, ring depth profile and material hardness of balls and rings.
WhatsApp: +86 18838072829about 700 800 mmWCL at mill inlet to lift the pulverized coal from mills to burners. The primary air flow is regulated generally by IGV. The auxiliary power used by PA fans account for % of gross energy generation at MCR as against to the design value of %. 6. In a 210 MW power plant six numbers of XRP 863 Bowl mills are installed.
WhatsApp: +86 18838072829This paper describes the characteristics of a coalfired coupled to biomass power generation technology on a 300 MW unit boiler, the characteristics of the coalfired coupled to biomass fuel, and ...
WhatsApp: +86 18838072829Station capacity determines the quantum of coal to be handled by coal handling plant and thus the capacity of coal unloading system, crushers, coal conveying system etc. Generally for unit size of 500 MW and above, one coal handling plant is provided to cater for two units. Coal conveying system may cater to maximum three units to limit
WhatsApp: +86 18838072829This article examines multiply connected coordinated control of Coal Fired 210 MW unit. An adaptive fuzzy coordination is being suggested, depending upon the current operational situation influence of the required electrical load and internal interferences, moslty due to the considerable, and with high frequency of reappearance variations in the calorific power of the fuel.
WhatsApp: +86 18838072829The present study aims at determining the actual performance of a coal based 210 MW power plant at full and part loads (210 MW and MW). Design and actual performance values of boiler efficiency, specific fuel consumption, heat rate and overall efficiency are compared. During actual performance, although small deviations are
WhatsApp: +86 188380728293. Description of 210 MW PCF Boiler under Study. Nashik Thermal Power Plant is located at Eklahare village near Nashik in. Maharashtra. The power plant is one of the coal based power plants of. MAHAGENCO. Nasik Thermal Power Station comprises of 2x140 MW and 3x210. MW units with total installed capacity of 910 MW.
WhatsApp: +86 18838072829A new initiative to increase the efficiency of coalbased thermal power plants was started in India, where 23 units of 210 MW were updated to meet the new standards. The results of the work done have been summarised into a report, which also explains the major auxiliary pieces of equipment involved.